The key features of this project
- Large processing area incorporated into the sandwich.
- Double continuous ridge ventilation on the 4.8 metre hoods with a section size of 5.4 metres.
- Large processing area created.
- Large spans in the structure for optimal partitioning of the working area.
- Use of door walls combined with a hoisting heating system.